This weekend we glassed the bottom of the boat. It took around 5 hours spread over 2 days. I have allowed a 100mm (4 inch) overlap on the centre line of the boat to maximise stiffness in that area. Total weight added was 9.04 kilograms. This girly is starting to put on some weight 😁😁.
8 pots with 250g resin in each ready to go. We then zeroed the scales and added hardner as needed (75g per pot)
Covers off trying to get some sun and heat into the epoxy to set it up quicker.
Thanks for reading and please feel free to comment or ask any questions.
Cheers Jay
No comments:
Post a Comment